Machinery & Fleet
Jaidhar continuously updates its technology to maintain state-of-the-art operations, thereby leading the market efficiently. Our batching plants, transit mixers and concrete pumps are primarily procured from Schwing Stetter, the pioneers of concrete and construction equipment in India.
Fully computerised horizontal, mobile and compact batching plants from Schwing Stetter with varying capacities from 30 cu.m per hour to 60 cu.m per hour.
All batching plants are controlled by MCI 360 and Siemens PLCS for quality assurance and precision mixing.
In Line Silos with large capacities ensure uninterrupted production at all times.
Ankireddypally Village, Keesara Mandal, Medchal Dist.
Basaragadi, Goudavelli, Medchal.
Kothwalguda (V), Rajendranagar, Shamshabad Mandal, R.R Dist.
Pati Ghanpur, Patancheru, Sangareddy Dist.
Sy No. 199, Mancherial – 504208. (North Telangana)
50 Units with Bharat Benz Chassis and Schwing Stetter Mixer Drums in 7, 8 and 9 cum capacities.
3 Units — Schwing Stetter 36M Telescopic Boom Pumps for high-rise and hard-to-reach placements.
12 Units — Schwing Stetter 1407/1807 line pumps for ground-level and horizontal concrete pumping.
36m Boom Placer from Stetter for precise concrete placement in large slab and floor pours.
Fleet of trucks from Bharat Benz, MAN and Eicher for efficient concrete transport across Hyderabad.
Mahindra cement bulkers and Ashok Leyland dump trucks ensure continuous material supply to all plants.
Jaidhar follows a stringent self-imposed quality control regimen — among the strictest in the industry. All factories are fully equipped and staffed with updated quality control machinery and trained personnel.
We carry out comprehensive testing programs to assure the best final product using quality raw materials. Jaidhar Concrete is known for maintaining consistency in quality irrespective of changes in time, place or temperatures.
Raw material sourcing and testing
Mix design and batching precision via MCI 360 / Siemens PLCS
In-transit consistency checks
On-site slump, temperature and cube testing
28-day compressive strength verification